Your city or county building department decides whether a project needs a permit, so the only firm answer comes from calling it or checking its website before work starts. Rules vary a lot by place. FEMA’s 2020 Building Codes Save study found that 65 percent of U.S. counties, cities and towns had not adopted modern hazard-resistant codes.
Say you spend the winter sketching a deck, and by March a contractor can start in two weeks. Whether that date holds depends on a phone call most people put off. No federal agency keeps a national list of projects that need a permit, and this guide does not pretend to give state-by-state rules. It shows you how to get a clear answer for your own address, which jobs should prompt the call, and how to write permit duties into the contract so they do not fall through the cracks.
How do you check with your local building department?
A ten-minute call usually settles it. Have your address and a one-sentence description of the work in front of you.
- Find the right office. Inside city limits, the city usually handles permits. In an unincorporated area, it is usually the county. Your property tax bill or the local government’s website shows which one covers you.
- Read the website first. Many departments post permit requirements, fee schedules, online applications and a list of work that is exempt.
- Call with specifics. Say what you are removing, what you are adding, and whether walls, wiring, plumbing, gas or the roof are involved.
- Ask the follow-ups. Which inspections are required, and when? Can the owner pull the permit, or only a licensed contractor? How long does review take? What does the fee depend on?
- Write it down. Note who answered, the date and what they said. If the answer is that no permit is needed, ask them to confirm it by email.
Mention anything unusual about the house: a flood history, a mapped flood zone, older wiring. Extra rules can stack on top of the basic building permit, and the answer for your house may differ from the one your neighbor got for a job that looked the same.
Which common projects should prompt the call?
Use this table to decide when to ask, not as a rulebook. The department makes the call for your address and your project.
| Project type | Should you ask first? | Why it raises the question |
|---|---|---|
| Removing or adding walls | Yes | It can change the structure of the house |
| New circuits, rewiring or panel work | Yes | Electrical work affects fire and shock safety |
| New or rerouted pipes, water heater replacement | Yes | Plumbing and gas affect water, drainage and combustion safety |
| Furnace, central air, heat pump or mini-split | Yes | Mechanical systems involve gas, refrigerant or heavy electrical loads |
| Additions, decks, sheds or anything that grows the footprint | Yes | Size and position on the lot can trigger zoning rules too |
| Roof replacement | Ask | Reroofing rules differ widely by place |
| Window or door replacement | Ask, especially if openings change size | Resizing an opening can affect framing |
| Fences and retaining walls | Ask | Height, setback and drainage rules are common |
| Painting, flooring, cabinet hardware | Lower on the list, but confirm if unsure | Usually cosmetic, but local rules control |
Kitchens and bathrooms often hit three or four rows at once: a moved sink, a new circuit, a wall that comes out. Our guide to planning a kitchen remodel and bathroom remodeling guide show where permits tend to come up in those jobs.

What drives the permit fee and the wait?
We have not found a national source for permit fees, so this table lists what usually moves the number and the calendar rather than dollar figures. Ask your department which of these it uses.
| Factor | How it tends to affect cost | How it tends to affect timing |
|---|---|---|
| Project value or square footage | Many fee schedules scale with one of these | Bigger jobs often need fuller plan review |
| Number of trades involved | Electrical, plumbing and mechanical work may each carry a fee | Each trade can add its own inspection |
| Drawings or engineering | Design fees come on top of the permit fee | Review waits until plans are complete |
| Zoning, flood or historic review | Separate approvals can add fees | A second office reviews on its own schedule |
| Digging | The 811 locate service is free | Adds 48 to 72 hours before anyone digs |
| Work already done without a permit | May mean opening finished surfaces for inspection | After-the-fact review can take longer |
What other approvals can apply besides the building permit?
A building permit is the approval most people know about. It is rarely the only one.
Lead-safe rules in older homes. The EPA’s Renovation, Repair and Painting Rule covers paid work that disturbs paint in housing built before 1978, above six square feet per room inside or 20 square feet outside. The firm doing that work must be EPA certified. This is a federal rule, separate from your local permit, and it applies whether or not your town requires a permit for the job.
Zoning and setbacks. Decks, sheds, fences and additions can be limited by how close they sit to property lines. The zoning or planning office usually handles this, sometimes in a different building from the permit counter.
Homeowners association or historic district rules. These are private or local design rules. They do not replace a permit, and a permit does not satisfy them. You may need both.
Floodplain rules. If your lot sits in a mapped flood area, ask the department whether floodplain requirements apply to your project.
Who should pull the permit, you or the contractor?
For hired work, the contractor usually pulls it, and the contract should say so in plain words. The FTC’s home improvement scam guidance lists a contractor who asks you to get the required building permits as a warning sign.
Some departments let owners pull their own permits for work they do themselves. If you go that way, ask what being the responsible party means and which inspections you must schedule. Ask, too, whether an owner permit can cover work you hire out. That answer decides who is on the hook if an inspection fails.
The FTC’s other contractor checks still apply. Consider only licensed and insured contractors, confirm the license with your state or county, and get several written estimates that spell out the work, materials, completion date and price. Our guide to common roofing contractor red flags walks through those checks on one of the most common permitted jobs.
How do permits fit into the schedule and payments?
Inspections give you natural points to pay the contractor. The FTC says not to pay the full amount up front, notes that some states limit down payments, and says to hold the final payment until the work is done and you are satisfied. A passed final inspection is a fair part of that test.
Say you hire someone to build a $12,000 deck, and your department requires footing, framing and final inspections. The amounts and percentages below are made up to show the method, not a legal standard. Check your state’s deposit limit first.
| Checkpoint | Share | Payment |
|---|---|---|
| Contract signed, permit issued | 10% | $1,200 |
| Footing inspection passed | 40% | $4,800 |
| Framing inspection passed | 30% | $3,600 |
| Final inspection passed | 20% | $2,400 |
| Total | 100% | $12,000 |
Build the waiting into your calendar. The 811 call needs 48 to 72 hours before anyone digs, and plan review and inspection slots add more. Ask the department for its usual review time, and be wary of a start date that assumes the permit is already in hand.
Does a permit prove the job was done right?
No. A permit and its inspections show the work met local code at the moments the inspector looked. They say nothing about whether the price was fair, whether the materials matched the bid, or whether the contractor holds a valid license and insurance.
So the FTC checks still matter on a fully permitted job. The reverse holds as well. Skipping a permit on cosmetic work your department exempts is fine, and pulling one does not make sloppy structural work safe.
What if work was already done without a permit?
Ask the department how it handles past work. Some have a way to permit it after the fact, which can mean opening finished walls or ceilings so an inspector can see the wiring, pipes or framing. Unpermitted work also tends to surface when you sell, because buyers and their inspectors ask about past projects.
If you expect to file an insurance claim involving that part of the house, ask your own insurer how your policy treats it. The answer depends on the policy and the state.
Which records should you keep?
Keep the permit, inspection sign-offs, contract and receipts in one folder. IRS Publication 523, written for 2025 returns, treats work such as a new roof, central air, a furnace, insulation or a deck as an improvement that adds to your home’s basis, while painting and fixing leaks generally count as repairs. The IRS sorts the work the same way whether or not a permit was required. A tax professional can explain how basis applies when you sell.
How are permit-heavy projects marketed?
Ads for roofing, heating and cooling, windows and solar often sell speed: no paperwork, start tomorrow. I have worked on the lead generation side of home services, and permits are where that pitch can quietly cut corners. A start date with no room for plan review is a reason to ask more questions.
Two other phrases deserve a second look: “we handle everything” with no word on who pulls the permit, and a price that drops if you skip it. Put permit duties in writing, and line bids up in our bid comparison worksheet so you can see which ones include the permit fee.
Before you sign: a permit checklist
- Call or check the building department. Describe the work, and note who answered, the date and what they said.
- Call 811 before any digging. Wait the required time for lines to be marked.
- Check other approvals. Zoning, floodplain, homeowners association and historic district rules can apply on top of the permit.
- Check the house’s age. For a pre-1978 home, hire an EPA-certified firm for paid work that disturbs paint.
- Vet contractors. Licensed, insured and backed by several written estimates, as the FTC recommends.
- Write permit duties into the contract. Name who pulls the permit and schedules inspections, and tie the final payment to a passed final inspection.
- Keep a project file. Permit, inspection records, contract and receipts together.
Doing the work yourself? Our list of easy weekend DIY projects sticks to jobs that rarely involve a permit.
Frequently asked questions
Who decides whether my project needs a permit?
Your city or county building department. No federal agency publishes a national list, and rules differ by place, so the department’s answer for your address is the one that counts.
How do I find out if I need a building permit?
Check the department’s website for permit requirements and exempt work, then call with your address and a plain description of the project. Write down who answered and what they said, or ask for the answer by email.
Should my contractor or I pull the permit?
For hired work, the contractor usually pulls it, and the contract should say so. The FTC lists a contractor who asks you to get the required permits as a warning sign.
Do I need to call 811 before installing a fence or deck?
PHMSA says every digging project requires a call to the one-call center, even planting trees or shrubs. Dial 811 48 to 72 hours before you dig, and wait for lines to be marked; the service is free.
Does a permit guarantee the work was done well?
No. Inspections check the work against local code at certain stages. They do not check the price, the materials against the bid, or the contractor’s license and insurance.